T35 "B" Enlargement
T35 "B" Enlargement

'B' Extension TL 35

'B' Extension TL 35 allows you to enlarge the mezzanine on the same direction as secondary beams; indeed, you needn’t dismantle the whole mezzanine.

You can get up to 70m² grace to this enlargement.

Features

This KIT contains 2 double height-adjustable columns, a lightweight frame with adjustable length and width. (extensible to 35m²) with the same characteristicas as TL 35 structure and structural wooden board to cover the surface.

 

 

In Stock

Preview the shipping fees

3,753.00 €

tax incl.

Shipping costs included

Opiniones de los clientes

Se el primero en dejar una opinión

Accessories

Data sheet

Kind of productExtensions kits
RangeLarge
CompatibilityLarge
Maximum height above the flooring board (mm)3426
Minimum height above the flooring board (mm)2090
Height above the beam (cm)207, 219, 232, 244, 256, 268, 280, 292, 304, 317, 329, 341
Beam height (mm)300
Height-adjustable every (mm)121
Width/Lenght-adjustable every (mm)100
Maximum width (mm)5476
Minimum width (mm)3676
Maximum length (mm)6350
Minimum length (mm)4450
Maximum area (m²)29
Minimum area (m²)14
Total maximum load (Kg)11500
Load capacity in its minimum extension (kg/m²)600
Load capacity in its maximum extension (kg/m²)200

Customer questions (0)

No customer questions for the moment.

Add product questions
Your Question has been successfully sent our team. Thanks for question!

Opiniones de clientes

Customers who bought this product also bought:

FREQUENTLY ASKED QUESTIONS

    What does the kit include?

    Tecrostar mezzanines and stairs are supplied with everything you need to install the kit at its maximum surface area or height.

    • All the beams and columns
    • The floor panels
    • All the nuts and bolts
    • Wall anchors
    • Assembly manual
    • Anchors for anchoring the columns to the floor

    Personalised phone or email service from our specialists


    Can I add an extension in the future?

    Yes, you can add an extension to an existing mezzanine. You do not need to buy both structures at the same time.


    Can an extension be installed to a mezzanine from a different range?

    No, the extension cannot be integrated and share columns. However, structures can be placed side by side and achieve continuity of the floor but you will not save any columns and there will be two columns together at the joints.


    How is it installed?

    To install Tecrostar mezzanines you need 2 adults (they do not need to be DIY experts). It is recommendable to use personal safety equipment like gloves, boots, etc. in order to avoid accident.

    When installing range L mezzanines you may need to use some type of scaffolding or ladder for working at heights and manual or electric lifting machinery to raise the primary beams, particularly if the structure is more than 3m high. The other ranges can be lifted easily by hand.

    You will need the following tools to install the mezzanines: tape measure, some type of spanner for m10 and m8 bolts and a screwdriver (an electric screwdriver will make the task much easier), spirit level, drill and a tool for cutting the panels (saw, jigsaw, circular saw, etc.)

    You can find all the tools required to assemble it and tested by Tecrostar in the tools section.

    All the models are installed by following these steps:

    Pre-assemble the structure on the floor in the desired area.

    Raise the outer structure to the desired height.

    Finish assembling the structure and floor.


    How long does it take to install?

    You can do it yourself with the help of a friend. It is easily installed in a few hours, depending on the product.

    TS8 Mezzanine: 3 hours with 2 people

    TM15 Mezzanine: 4 hours with 2 people

    TL30 Mezzanine: 5 hours with 3 people

    The times are a guideline and for assembly only. You need to add the time it takes to measure up, move the components to the location, clean up, etc.


    What if the access to the delivery address is complicated? 

    Sometimes, the carrier cannot access to point of delivery due to an extremely narrow street or any other difficulty. In such cases, the carrier cannot do the delivery with the usual truck and he may need to use a different vehicle or extra support. If the carrier considers that the point of delivery is complicated, request a quotation. If you don’t inform in advance that the access is complicated, the delivery will be paralysed until you pay the extra cost.