The ‘B’ extension module for the Tecrostar mezzanine TM 10 allows to extend the mezzanine in the direction of the secondary beams.
Adding this extension, you can get up to 20m² of extra surface.
If the extension module is going to be assembled once the mezzanine TM 10 is already installed, the main module should not have any load on it.The ‘B’ Extension TM 10 kit includes 2 height-adjustable double pillars and a light slab adjustable in width and length (extendible up to 10m²) with the exact same features as the Mezzanine TM 10. It also includes the supporting floor, that is formed by structural wooden boards to cover the entire surface.
In Stock
Warning: Last items in stock!
Availability date:
Range | Medium |
Compatibility | Medium |
Maximum height above the flooring board (mm) | 2333 |
Minimum height above the flooring board (mm) | 1725 |
Flooring material | European Radiata pine plywood 18 mm thick |
Height-adjustable every (mm) | 121 |
Width/Lenght-adjustable every (mm) | 100 |
Net weight (Kg) | 280 |
Gross weight (Kg with packaging) | 312 |
Which height above the flooring board is needed? | From 173 to 209 cm, From 209 to 233 cm, From 233 to 282 cm |
No customer questions for the moment.
Add product questionsName: | |
Email: | |
Question: | |
Language: | |
Add product questions |
Tecrostar mezzanines and stairs are supplied with everything you need to install the kit at its maximum surface area or height.
Personalised phone or email service from our specialists
Yes, you can add an extension to an existing mezzanine. You do not need to buy both structures at the same time.
No, the extension cannot be integrated and share columns. However, structures can be placed side by side and achieve continuity of the floor but you will not save any columns and there will be two columns together at the joints.
https://www.youtube.com/embed/nxnj2ad9zqy
To install Tecrostar mezzanines you need 2 adults (they do not need to be DIY experts). It is recommendable to use personal safety equipment like gloves, boots, etc. in order to avoid accident.
When installing range L mezzanines you may need to use some type of scaffolding or ladder for working at heights and manual or electric lifting machinery to raise the primary beams, particularly if the structure is more than 3m high. The other ranges can be lifted easily by hand.
You will need the following tools to install the mezzanines: tape measure, some type of spanner for m10 and m8 bolts and a screwdriver (an electric screwdriver will make the task much easier), spirit level, drill and a tool for cutting the panels (saw, jigsaw, circular saw, etc.)
You can find all the tools required to assemble it and tested by Tecrostar in the tools section.
All the models are installed by following these steps:
Pre-assemble the structure on the floor in the desired area.
Raise the outer structure to the desired height.
Finish assembling the structure and floor.
You can do it yourself with the help of a friend. It is easily installed in a few hours, depending on the product.
TS8 Mezzanine: 3 hours with 2 people
TM15 Mezzanine: 4 hours with 2 people
TL30 Mezzanine: 5 hours with 3 people
The times are a guideline and for assembly only. You need to add the time it takes to measure up, move the components to the location, clean up, etc.
Sometimes, the carrier cannot access to point of delivery due to an extremely narrow street or any other difficulty. In such cases, the carrier cannot do the delivery with the usual truck and he may need to use a different vehicle or extra support. If the carrier considers that the point of delivery is complicated, request a quotation. If you don’t inform in advance that the access is complicated, the delivery will be paralysed until you pay the extra cost.